10 Year Warranty

Free Delivery
A riser door is the full-height access door into a service riser or shaft — the vertical route carrying pipework, cabling and ductwork up through a building. Because risers pass through every floor, the door in front of one is doing serious compartmentation work: it has to hold the fire line, resist smoke passing between floors, and often control noise breaking out into a communal corridor.
Orders Over £200
Up to 2 Hours
Picture & Beaded Frames
Bulk Orders
Call 0116 360 2699
Discover quality solutions designed for performance, durability and easy installation, with options to suit every project.
Riser doors are usually specified rather than picked off a shelf, and the wrong assumption here is expensive to correct once the shaft is boarded. These are the five points that decide the product.
The riser door should match the fire resistance required for the shaft construction. Check the fire strategy or approved drawings rather than relying on the existing door, particularly on refurbishment projects.
Some doors are tested from one side only, while risers may require protection from fire originating inside or outside the shaft. Where this risk applies, choose a door tested for the required direction of fire exposure.
Fire resistance and smoke control are separate requirements. Where smoke protection is specified, choose a riser door with the appropriate smoke classification, such as Sa or S200.
Risers can transmit noise from pipes, pumps and building services into nearby rooms. If acoustic control is required, choose a tested riser door with the specified dB rating.
Choose the door configuration based on the size of equipment that needs to pass through the opening. For communal areas, use a suitable keyed or tool-operated lock to restrict unauthorised access.
Compare available options against key technical and project requirements, including material, intended use, performance, and finish.
Send us your sizes, drawings or door schedule and we will quote a made-to-measure solution.
A quick guide to help you understand the installation process from start to finish.
Confirm the structural opening matches the door schedule and that the surrounding shaft construction is complete, sound and ready for installation.
Confirm the supplied door matches the specified fire rating, sided rating and any required smoke or acoustic performance before installation.
Offer the frame into the opening and check that it is square and plumb. The frame must be correctly aligned for the door to seal properly.
Fix the frame using the specified fixings and centres. Fixing type and spacing form part of the tested assembly, so do not substitute. [Confirm fixing specification.]
Fire-stop the perimeter gap between the frame and structure to the tested detail, using the specified sealant or backing material.
Check the door swings, closes and latches without binding, with smoke seals continuous and undamaged. Record the installation and retain product documentation for the building safety case or Building Control handover.
Discover how we bring style, comfort, and strength to every project. Check our client stories.
Have a project in mind or need expert guidance?
Get in touch with our team today and let us help you find the right industrial solutions tailored to your requirements.
Find answers to the most common questions about our services, processes, and how we can help you achieve your goals.