10 Year Warranty

Free Delivery
A meter over box is an enclosure fitted over an existing gas or electricity meter, rather than a replacement for the meter housing. It does two jobs: it restores the fire compartmentation around a meter that sits in a communal area, and it stops the meter being tampered with while still allowing the supplier legitimate access to read it.
Orders Over £200
Up to 2 Hours
Picture & Beaded Frames
Bulk Orders
Call 0116 360 2699
Discover quality solutions designed for performance, durability and easy installation, with options to suit every project.
Over boxes fail on fit far more often than on performance. Because they go over something that already exists and cannot move, measuring is the whole job.
Measure the meter, pipework, valves and anything projecting from the front, then allow enough clearance for the door to close properly. Depth is especially important where pipework sits in front of the meter.
Meters in communal hallways, lobbies or escape routes may require a fire-rated enclosure. Check the building’s fire strategy and required fire period before ordering.
Gas and electric meters have different ventilation, clearance and access requirements. If both are housed together, confirm whether a combined enclosure is suitable or separate boxes are required.
Choose a locking system that prevents unauthorised access while still allowing utility suppliers to access the meter. Confirm the required lock type with the relevant utility provider before installation.
The enclosure must allow the meter to be read and the supply to be isolated when required. Check the door swing, valve access and surrounding space to ensure the box does not obstruct the escape route.
Compare available options against key technical and project requirements, including material, intended use, performance, and finish.
Send us your sizes, drawings or door schedule and we will quote a made-to-measure solution.
A quick guide to help you understand the installation process from start to finish.
Record the existing installation dimensions, including height, width and full depth around pipework, valves and tails.
Confirm the required fire rating and locking arrangement with the fire strategy and utility provider before ordering.
Ensure the enclosure is fixed to a suitable background. Fire-rated enclosures must be installed to a substrate covered by the tested detail.
Position the enclosure so the meter remains accessible for reading and isolation, with the open door clear of the corridor.
Use the specified fixings and centres, keeping the enclosure square so the door closes cleanly.
Provide the required ventilation for gas installations — do not seal a gas meter enclosure. Fire-stop the perimeter to the tested detail and record the installation for the building safety file. [Confirm ventilation requirement.]
Discover how we bring style, comfort, and strength to every project. Check our client stories.
Have a project in mind or need expert guidance?
Get in touch with our team today and let us help you find the right industrial solutions tailored to your requirements.
Find answers to the most common questions about our services, processes, and how we can help you achieve your goals.